West Warwick Place, London SW1

For this specialised contract we were commissioned to design and undertake a total refurbishment of a roof structure in central London. As the pre-work gallery images illustrate, the original covering and structure was in very poor condition and did not contain vital lead flashings to keep the building weather-proof. This major issue was responsible for considerable water ingress prior to the work being completed.

The existing synthetic roofing slates were suspected to contain asbestos so we consulted our asbestos removal firm, a sample was sent for testing prior to works commencing and the slates were found to contain asbestos. We commissioned specialists to remove the roof covering under controlled conditions.

Project Summary

Daniels Group provided the following services: